Contact Us
Address:No.4 Wucheng Road, Taiyuan, Shanxi, P.R.China 030006
Trade Manager: Susan Zhang
E-mail: susanzhang@jh-mech.com
24-hour Hot Line: +86-351-7650117
JH-Mech Custom Carbon Steel Carpet Protective Film Applicator
The improved PAD ‘N PROTECT Applicator features better connectors and secure foam packaging for added strength and safe delivery. Designed for fast, smooth application, it includes a quick-release system, smooth roller, and ergonomic handle for bubble-free results. Adjustable to fit 24”–36” films and 1.5” or 3” cores, it’s perfect for any job—construction, moving, or renovation. Built tough for frequent use, this tool makes carpet protection faster, easier, and more professional.
Classification:
Products
Carpet Film Protection Applicator
Keywords:
Hotline:
Description
JH-Mech Custom Variable High Efficiency Durable Carbon Steel Carpet Protective Film Applicator
Prepared by Joy Zhang 26/6/2026
Product Description

Carpet Film Protection Applicator
The improved PAD ‘N PROTECT Applicator features better connectors and secure foam packaging for added strength and safe delivery. Designed for fast, smooth application, it includes a quick-release system, smooth roller, and ergonomic handle for bubble-free results. Adjustable to fit 24”–36” films and 1.5” or 3” cores, it’s perfect for any job—construction, moving, or renovation. Built tough for frequent use, this tool makes carpet protection faster, easier, and more professional.



Carpet Film Protection Applicator Instruction
1. Place the rubber handle cap onto the handle rod. 2. Join the handles together. 3. Attach the handles to the T-bar. 4. Secure the red roller onto the extension bar on the longer side. 5. Secure the white roller onto the extension bar on the shorter side. 6. Insert the extension bar into the T-bar (Adjust the length according to the roll size; position closest to the T-bar for a 24” carpet protection roll, and farthest from the T-bar for a 36” carpet protection roll). 7. Insert a silver tube (Select the same side as the carpet protection film) onto the white roller. 8. Place a carpet protection roll onto the red roller. 9. Repeat the step 4 and 5 onto another extension bar. 10. Attach the extension bar to the other end of the T-bar. The red roller should align with the carpet protection, while the white roller should align with the silver tube
Specification
Manufacturer | JH-Mech |
Item Weight | 16.52 pounds |
Product Dimensions | 37.5 x 18 x 2 inches |
Material | Carbon Steel |

The carpet film applicator adopts modular design,here are all the accessories, plus an instruction manual

The carpet shield applicator is easy to assemble and can be put together in just 2-3 minutes by following the manual

The carpet protection film applicator eliminates time-consuming manual work,allowing you to easily complete a job that used to require 2-3 people

The carpet shield applicator is made of high-strength metal and materials,which is sturdy anddurable,noteasy to deform, and remains stable after long-term use

This carpet protection film applicator is suitable for a variety of scenarios
1.Protect carpets from paint dust, and debris during home renovations. 2.Prevent shoe marks and scratches during moving. 3.Protect carpets when selling a property. 4.Quickly protect carpets at trade shows or temporary events.

Save time and effort
The carpet protection film applicator saves you from tiring, time-consuming work, letting one person easily finish a job that once took 2-3 people, with the film laid flat, smooth, and neat
Company

FAQ
Q: Are you trading company or manufacturer?
A: We are factory.
Q: What do you need to provide a quote?
A: Please kindly send us the drawing or the sample of your product. Details below should be included,
a.Materials
b.Surface Finish
c.Tolerance
d.Quantity (Please be noted that these are essential for our quoting. We couldn't quote the specific price without any of them.)
Q: Do you provide samples? Is it free or extra?
A:Yes, we can offer 1-5 pcs of free samples after paid mold cost.
Q: How do I know about the production?
A: We will double confirm your requirements and send you the sample before the mass production. During the mass production, we will keep you informed of any progress. Besides, we will do 100% quality inspection before shipment.
Q: How long is your delivery time?
A: Generally it is 15-20 days for sample making. Mass production time is according to quantity.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us!
Q: What will you do for after sales?
A: When our metal parts apply to your products, we will follow up and await your feedback. Any question related to our metal parts, our experienced engineers are ready to help.
Previous page
Product message
Related products